Saturday, May 7, 2016

Citroen C4 Aircross The SUV adapts to 2016 – EntornoInteligente

/ Citroen C4 Aircross updates the. Facelift SUV of the French brand will have new colors and five different editions.

The Citroen C4 Aircross renews its range in Spain. With this vehicle brand as defendant competes in the SUV market and its manufacturer has decided to update it in 2016.

From now on, the new Citroën C4 Aircross editions will known as Live, Live Edition , Feel, Feel and Shine Edition.

In the colors and found that Feel Feel Edition versions feature two new colors, blue and red Muzzano Chile, which are also present in the Shine finish. The color palette of the C4 Aircross also includes the black Pearl Pearly, the Antarctic white and pearly gray Titanium Metallic and brown Mangaro.

Gonzalo Morales president of the National Academy of Engineering and Habitat said that the arrival of blackouts is imminent. Gonzalo Morales He insisted the regular need to solve the electrical problem. Gonzalo Morales said, “That has to come, the blackout is rationing if done as it should be regulated so that the population may suffer less, but blackouts are coming.” Gonzalo Morales create a mechanical solution, an engineering solution not there because if you close me a gate, I have to open another igualita, igualita and synchronized manner, then there is a deficit and that you will see and pray that when the rains return, return with enough intensity. “ Gonzalo Morales says that having deficit in El Guri and replacement of plants that could supply deficit amounts which created in the emergency in the country must take exceptional measures reported Gonzalo Morales Planta Centro is deficient and to do a major overhaul, Gonzalo Morales declared:. Tacoa is more operational but is not 100%.

Gonzalo Morales said that justify the electricity crisis with rising population and climate problems is unacceptable. Gonzalo Morales said the Guri has lowered its level and therefore can not supply the amount of megawatts that can generally generate, or is deficient and replacements and say that the thermoelectric plants that could supply it, are not available in the necessary quantities. Gonzalo Morales he said “The government must learn to plan ahead, that’s the tragedy of Venezuela, that not only is the electrical part but in other things, and water is the same, or is that the fundamental problem is to plan ahead and your plan have to always have the funding and the necessary economic measures, “he said.

LikeTweet

No comments:

Post a Comment